Pronar PT610
SECTION 4
4.2
4.1
PREPARING FOR WORK BEFORE THE FIRST USE
4.1.1 CHECKING THE TRAILER AFTER DELIVERY
The manufacturer guarantees that the trailer is fully operational and has been checked
according to quality control procedures and is ready for normal use. This does not release
the user from an obligation to check the machine's condition after delivery and before first
use. The machine is delivered to the user completely assembled.
Before commencing work, machine operator must inspect the technical condition of the trailer
and prepare it for the first start-up. The user must carefully read this Operator's Manual and
observe all recommendations, understand the design and the principle of machine operation.
ATTENTION
Before hitching to tractor and using the trailer, the user must carefully read this
Operator's Manual and observe all recommendations.
External inspection
Check completeness of machine (standard and optional equipment).
Check condition of protective paint coat,
Inspect trailer's individual components for mechanical damage resulting from
incorrect transport (dents, piercing, bent or broken components).
Check technical condition of tyres and tyre pressure.
Check technical condition of elastic hydraulic conduits.
Check technical condition of pneumatic conduits.
Check that there are no hydraulic oil leaks.
Check electric lamps.
Check tipping ram cylinder for hydraulic oil leaks.
Summary of Contents for PT610
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...Pronar PT610 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 63: ...SECTION 4 CORRECT USE ...
Page 87: ...SECTION 5 MAINTENANCE ...
Page 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Page 129: ...NOTES ...
Page 130: ... ...