SECTION 5
Pronar PT610
5.9
Loosen wheel nuts according to sequence shown in figure (5.4).
Place lifting jack and lift trailer.
Dismount wheel.
Wheel mounting
Clean axle pins and nuts of contamination.
Do not grease thread of nuts and pins.
Check condition of pins and nuts, if necessary replace them.
Place wheel on hub, tighten nuts so that wheel rim tightly fits the hub.
Lower the trailer, tighten nuts according to recommended torque and given
sequence.
TIP
Wheel nuts should be tightened using the torque of 450 Nm - M22x1.5 nuts.
Tightening nuts
Nuts should be tightened gradually diagonally, (in several stages, until obtaining the required
tightening torque) using a torque spanner. If a torque spanner is not available, one may use
an ordinary spanner. The arm of the spanner (L), figure (5.4), should be selected according
to the weight of the person (F) tightening the nut. Remember that this method of tightening is
not as accurate as the use of a torque spanner.
Summary of Contents for PT610
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...Pronar PT610 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 63: ...SECTION 4 CORRECT USE ...
Page 87: ...SECTION 5 MAINTENANCE ...
Page 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Page 129: ...NOTES ...
Page 130: ... ...