SECTION 5
Pronar PT610
5.5
5.2.4 CHECK WHEEL AXLE BEARINGS FOR SLACKNESS
FIGURE 5.2
Lifting jack support point
(1) wheel axle, (2) U bolt
Preparation procedures
Hitch trailer to tractor, immobilize tractor with parking brake.
Park tractor and trailer on hard level ground.
Position tractor to drive straight forward (front trailer axle may not be
turned).
Place chocks under trailer rear wheel. Ensure that trailer shall not move during
inspection.
Raise the wheel (opposite to the side where chocks are placed).
The lifting jack should be placed between U bolts (2) - figure (5.2)
securing axle (1) to shock absorber leaf springs, or as near as
possible to leaf spring mounting. Recommended fulcrum is marked
with an arrow. Lifting jack must be suitable for the weight of trailer.
Summary of Contents for PT610
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...Pronar PT610 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 44: ...Pronar PT610 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 63: ...SECTION 4 CORRECT USE ...
Page 87: ...SECTION 5 MAINTENANCE ...
Page 117: ...SECTION 5 Pronar PT610 5 31 FIGURE 5 12 Trailer s lubrication points part 2 ...
Page 129: ...NOTES ...
Page 130: ... ...