![PRONAR PT512 Operator'S Manual Download Page 94](http://html.mh-extra.com/html/pronar/pt512/pt512_operators-manual_1617396094.webp)
Pronar PT512
CHAPTER 4
4.26
•
Check the tightening of the nuts after first operation of the trailer, after the first
driving with load and then once per 6 months of operation or 25,000 kilometers. In
the event of intensive work checking the nut tightening should be done at least
every 100 km. The inspection should be repeated if a wheel has been removed
from the axle.
•
Regularly check and maintain correct pressure in tires according to Operator's
Manual (especially if trailer is not used for a longer period).
•
The air pressure should be also checked after the whole day of intensive work.
Please note that higher temperatures could raise tire pressure by as much as 1
bar. In case of such temperature and pressure rise, reduce the load or speed.
•
Do not release air from tires to adjust the pressure.
•
Protect tire valves using suitable caps to avoid soiling.
•
Do not exceed the trailer's maximum design speed.
•
When the trailer is operated all day, stop working for a minimum of one hour in
the noon.
•
To cool down the tires, stop for 30 minutes each time after driving 75 km or after
150 minutes of continuous travel depending on which occurs first.
•
Avoid potholes, sudden maneuvers or high speeds when turning.
4.8
OPERATING THE UNDER RUN PROTECTIVE DEVICE
The trailer can be optionally equipped with two pairs of under run protective devices; both
devices can be tilted. Because these devices play an important role in road traffic safety,
ensure they are complete and in good condition.
Lifting
•
Pull the under run protective device by holding the lower beam of the device.
•
Lift the under run protective device as shown on figure (4.7)
•
Push the device away. The under run protective device can be secured in lifted
position by means of a relevant recess and longitudinal holes of the bracket.
Summary of Contents for PT512
Page 2: ......
Page 6: ......
Page 11: ...CHAPTER 1 GENERAL INFORMATION ...
Page 26: ...Pronar PT512 CHAPTER 1 1 16 ...
Page 27: ...CHAPTER 2 SAFETY OF OPERATION ...
Page 45: ...CHAPTER 2 Pronar PT512 2 19 FIGURE 2 3 Locations of information and warning decals ...
Page 46: ...Pronar PT512 CHAPTER 2 2 20 ...
Page 47: ...CHAPTER 3 DESIGN AND OPERATION ...
Page 68: ...Pronar PT512 CHAPTER 3 3 22 ...
Page 69: ...CHAPTER 4 CORRECT USE ...
Page 97: ...CHAPTER 5 MAINTENANCE ...
Page 126: ...Pronar PT512 CHAPTER 5 5 30 FIGURE 5 11 Trailer lubrication points part 1 ...
Page 127: ...CHAPTER 5 Pronar PT512 5 31 FIGURE 5 12 Trailer lubrication points part 2 ...
Page 137: ...NOTES ...
Page 138: ... ...