![PRONAR PT512 Operator'S Manual Download Page 5](http://html.mh-extra.com/html/pronar/pt512/pt512_operators-manual_1617396005.webp)
DETERMINING THE DIRECTIONS FOR THE MANUAL'S NEEDS
Left side — a left hand side of the person facing the machine's forward travel direction.
Right side — a right hand side of the person facing the machine's forward travel direction.
SCOPE OF OPERATION STEPS
Operation steps are indicated with the following sign:
The result of an operation/adjustment task or any notes on execution of the tasks performed is
indicated with the sign
Summary of Contents for PT512
Page 2: ......
Page 6: ......
Page 11: ...CHAPTER 1 GENERAL INFORMATION ...
Page 26: ...Pronar PT512 CHAPTER 1 1 16 ...
Page 27: ...CHAPTER 2 SAFETY OF OPERATION ...
Page 45: ...CHAPTER 2 Pronar PT512 2 19 FIGURE 2 3 Locations of information and warning decals ...
Page 46: ...Pronar PT512 CHAPTER 2 2 20 ...
Page 47: ...CHAPTER 3 DESIGN AND OPERATION ...
Page 68: ...Pronar PT512 CHAPTER 3 3 22 ...
Page 69: ...CHAPTER 4 CORRECT USE ...
Page 97: ...CHAPTER 5 MAINTENANCE ...
Page 126: ...Pronar PT512 CHAPTER 5 5 30 FIGURE 5 11 Trailer lubrication points part 1 ...
Page 127: ...CHAPTER 5 Pronar PT512 5 31 FIGURE 5 12 Trailer lubrication points part 2 ...
Page 137: ...NOTES ...
Page 138: ... ...