9
Chapter 2: VTrak Installation
This chapter covers the following topics:
•
Unpacking the VTrak (below)
•
Mounting VTrak M610i in a Rack (page 10)
•
Mounting VTrak M310i or M210i in a Rack (page 12)
•
Installing Disk Drives (page 15)
•
Making Management and Data Connections (page 18)
•
Making Serial Cable Connections (page 20)
•
Connecting the Power (page 21)
Unpacking the VTrak
The VTrak box contains the following items:
•
VTrak Unit
•
Quick Start Guide
•
Null Modem Cable
•
Left and right center-mount
brackets
•
Left and right mounting rails
•
Screws for disk drives
(36 for M210i; 52 for M310i; 70 for
M610i; including 4 spares)
•
1.5m (4.9 ft) Power cords (2 for US
and 2 for Europe)
•
CD with SNMP files,
Product
Manual
and
Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Important
Use the following categories of network cables with VTrak:
•
Cat 6, preferred
•
Cat 5E, minimum
Summary of Contents for VTRAK M210i
Page 1: ...VTRAK M610i M310i M210i Product Manual Version 0 9 ...
Page 14: ...VTrak M610i M310i M210i Product Manual xiv ...
Page 22: ...VTrak M610i M310i M210i Product Manual 8 ...
Page 53: ...Chapter 4 Management with WebPAM PROe 39 Figure 1 The WebPAM PROe log in screen ...
Page 144: ...VTrak M610i M310i M210i Product Manual 130 ...
Page 212: ...VTrak M610i M310i M210i Product Manual 198 ...
Page 232: ...VTrak M610i M310i M210i Product Manual 218 ...
Page 256: ...VTrak M610i M310i M210i Product Manual 242 ...