5.2 Requirements at the place of installation........................................... 25
5.3 Preparatory work................................................................................ 26
5.4 Installation in the pipe system............................................................ 29
5.5 Initial startup....................................................................................... 33
5.6 Electrical connection.......................................................................... 34
5.6.1 Connector DIN 43650..................................................................... 35
5.6.2 Plug connector M12x1.................................................................... 36
5.6.3 Cable............................................................................................... 36
5.6.4 Degree of protection (IP-Code)....................................................... 37
5.7 Grounding the device......................................................................... 37
5.8 Plug connection.................................................................................. 37
5.9 Contact protection measures............................................................. 39
6
Operation
...................................................................................................
42
6.1 Switch point adjustment..................................................................... 42
6.2 Checking the flow............................................................................... 44
7
Troubleshooting
.......................................................................................
45
7.1 Safety................................................................................................. 45
7.2 Troubleshooting guide........................................................................ 47
8
Maintenance
..............................................................................................
49
8.1 Safety................................................................................................. 49
8.2 Maintenance plan............................................................................... 49
8.3 Removal from the pipe system........................................................... 50
8.4 Disassembly....................................................................................... 51
8.5 Maintenance....................................................................................... 55
8.5.1 Cleaning.......................................................................................... 56
8.5.2 Parts replacement........................................................................... 57
8.5.3 Assembly......................................................................................... 57
8.5.4 Switch contact replacement............................................................ 62
8.6 Measures to be taken after maintenance work.................................. 64
9
Disassembly and disposal
.......................................................................
65
9.1 Safety................................................................................................. 65
9.2 Disassembly....................................................................................... 65
Table of contents
27.04.2015
5
Summary of Contents for SW-01
Page 69: ...Fig 59 Type SW 04 3 4 Technical data Dimension sheet 27 04 2015 69...
Page 70: ...Fig 60 Typ SW 04 1 Technical data Dimension sheet 27 04 2015 70...
Page 153: ...Fig 60 Type SW 04 3 4 Technical data Dimension sheet 18 03 2015 70...
Page 154: ...Fig 61 Type SW 04 1 Technical data Dimension sheet 18 03 2015 71...