Fig. 54: Remove the switch contact
from guide rails
4.
Slide the switch contact from the
guide rail (Fig. 54).
Fig. 55: Remove switch contact
5.
Remove the switch contact from
the device
6.
Position the new switch contact
7.
Slide the switch contact onto the
guide rails
8.
Connect a continuity meter. For
Normally Open Contact
(NOC),pin 1 and pin 2 are
assigned; for Change Over Con-
tact (COC), pin 1 and pin 3 are
assigned
9.
Slide the switch contact in the
opposite direction of flow up to
the stop. The switch contact
must now be closed.
Maintenance
Maintenance > Switch contact replacement
18.03.2015
64
Summary of Contents for SW-01
Page 69: ...Fig 59 Type SW 04 3 4 Technical data Dimension sheet 27 04 2015 69...
Page 70: ...Fig 60 Typ SW 04 1 Technical data Dimension sheet 27 04 2015 70...
Page 153: ...Fig 60 Type SW 04 3 4 Technical data Dimension sheet 18 03 2015 70...
Page 154: ...Fig 61 Type SW 04 1 Technical data Dimension sheet 18 03 2015 71...