Installation and initial startup
5.1 Safety
Incorrect installation and initial
startup
WARNING!
Risk of injury due to incorrect
installation and initial startup!
Incorrect installation and initial
startup may result in severe inju-
ries and considerable damage to
property.
–
Ensure that the site is suffi-
ciently cleared of obstructions
before commencing work
–
Handle open or sharp edged
components carefully
–
Ensure that the assembly
location is orderly and clean!
Parts and tools lying about or
on top of each other are
potential causes of accidents
–
Assemble components prop-
erly. Observe the stipulated
tightening torque of screws
–
Before initial startup, make
sure that all installation work
has been carried out and com-
pleted in compliance with the
specifications and instructions
in these Operating Instructions
Safeguard against restart
WARNING!
Danger to life due to unauthor-
ized restart!
There is a risk of severe or even
fatal injuries from unauthorized
restart of the power supply during
installation.
–
Before commencing work,
switch the power supply off to
the whole system/plant and
secure against restart
5.2 Requirements at the
place of installation
The place of installation must meet the
following criteria:
n
The device must not be under
water.
n
The surrounding area must be illu-
minated sufficiently.
n
There must be sufficient space to
prevent accumulation of trapped
heat.
n
The device must not be installed
as a supporting part in a pipe con-
struction.
n
The device may not have anything
affixed to, or suspended from it.
Installation and initial startup
Requirements at the place of installation
18.03.2015
25
Summary of Contents for SW-01
Page 69: ...Fig 59 Type SW 04 3 4 Technical data Dimension sheet 27 04 2015 69...
Page 70: ...Fig 60 Typ SW 04 1 Technical data Dimension sheet 27 04 2015 70...
Page 153: ...Fig 60 Type SW 04 3 4 Technical data Dimension sheet 18 03 2015 70...
Page 154: ...Fig 61 Type SW 04 1 Technical data Dimension sheet 18 03 2015 71...