11.2 Winterization Checklist
NA
NOTES:
Check Sumps for Sediment Accumulation —
Notify Owner if Excessive
Inspect and Clean Component Filters
Remove Pressure Transducer, Blow Water Out and
Leave Transducer in Electrical Panel
Inspect and Clean Enclosures (Interior & Exterior)
Close Pump Station Isolation Valve and
Relieve Pressure
Precision Pumping Systems
•
GoPPS.com
•
6515 Business Way, Boise, ID 83716
•
208.323.5300
62
Remove Pressure Switch, Blow Water Out and Leave
Switch in Electrical Panel
Unscrew Solenoid from CW Valve
Remove Lowest Ends of Tubes on Pressure
Relief Valve
Amiad SAF - Remove Tubing from Bottom of
PSID Switch
Amiad SAF - Remove Black Canister from Flush Valve
Filter, Inspect and Clean Filter and Open
Amiad SAF - Remove Lower Tubing from 2” Flush
Valve and Pilot
Amiad SAF - Set Three Way PSID Test Valve to
Half Open
Amiad TAF - Remove Screen Canister and Drain
Amiad TAF - Remove One End of All Tubing & Drain
Set Pump Discharge Valves to the Half Open Position
Drain Pump Columns if Check Valves are on Pumps
Centrifugals - Remove Lower Drain Plug
Visually Inspect System for any Trapped Water
Leave Winterizing Label Near Disconnect saying
“WINTERIZED”, Today’s Date, and “DO NOT OPERATE”
Is a return trip immediately required: YES - NO
What items are needed on return? (List below or on back of page)
Examine, Test Self-Cleaning CW Screen Feed Valves
and Lines
Remove Plug from Manifold and Leave in
Electrical Panel