START-UP & WINTERIZATION
11.1 System Start-Up Checklist
NA
NA
Check Incoming Voltage and Record
Adjust High- & Low-Pressure Switches
Make / Inspect Motor Lead Connections
Test, Adjust Low Water Float
Check Circuit Breakers Connections & Trip Rating
Check AMP Draw - All Pumps
Check Safety of All Electrical Components
Check VFD Parameters; Adjust Where Needed
Turn on Main Disconnect
Test, Recalibrate All HMI Settings
Check Rotation of Pumps with VFD
Test Direction of Amiad Filter Travel & Limit Switches
All Valves, Operators, and Controls in Operating
Settings
Isolate and Pressure Test Manifolds, Tubing, and
Hose Connections
Inspect Incoming Power Connections
Adjust Quick Pressure Relief Valve
Check Overloads Connections and Settings
Test Amiad Filter Operation
Check Field Strip for Proper Connections
Test All Butterfly Valves
Inspect, Tighten All Electrical Connections, Lugs
Test Self Cleaning CW Screen Feed Valves & Lines
Check Voltage Monitor Settings
Test Overall VFD Operation, Lag Starts / Stops
Check Rotation of Pumps when Alternating
Check Settings in HMI for Pre-Start
On-Site Photos of Condition and Operation
NOTES:
Start-Up Data and Parameter Settings
Voltage
AMPS Jockey
HP Switch PSI
VFD Sleep Hz
AMPS Motor 1
PSI Setpoint
HP Relief PSI
Wake up Dev.
AMPS Motor 2
HP Setpoint
Low PSI Setpoint
Full Run Voltage
Job Name:
Technician:
Date: