8
9
It is mandatory that the
ground terminal is connected
to the grounding cable
network.
IMPORTANT
The electrical installation must have a residual current (RCD)
device with a rated residual current of 30 mA.
CARE WITH THE GATE bEFORE THE AUTOMATION
Before adapting the machine to the gate, check the gate movement by following
the instructions below:
Step 1:
Before installing the operator, check if the gate is in good mechanical
condition, ie opening and closing properly. Open the gate manually and observe
the required eff ort. This eff ort should be minimal for the entire length of the rail.
Step 2:
Close the gate manually and check whether the eff ort was the same as the
previous operation.
The gate shall have a sturdy and, as far as possible, non-deformable structure. The
pulleys shall have a diameter suitable to the dimensions of the gate, shall be in
perfect running condition and shall be mounted in such a way that the gate leaf
has stability along all its displacement. We recommend pulleys with a diameter of
at least 120 mm.
The fi gures below represent the two types of rails and pulleys used. The system
that uses straight section (Figure A - angle bracket) exhibits greater friction
and consequently greater wear. The circular section (Figure B) allows a better
displacement of the gate and less friction for the operator.
FIGURE A
FIGURE B
Step 3:
Check wether the gate leaf does not jam in the opening and closing
movement. The slide rail of the gate must be perfectly rectilinear, undercut, and clear
of any element or dirt that makes it diffi cult to slide the pulleys in their entire length.
INSTALLATION OF THE OPERATOR
Before installing the operator, remove all unnecessary cables and
disable any equipment or system connected to the mains.
EQUIPMENT DIMENSIONS
Z12 = 117 Z17 = 132
Z12 = 117 Z17 = 132
Z12 = 117 Z17 = 132
NOTE: All measurements are in milimeters.