18
6000VA
D curve – 63A (1 phase)
63A (1 phase)
40A (1 phase)
10000VA
D curve – 80A (1 phase)
80A (1 phase)
63A (1 phase)
10000VA 3-1
D curve – 80A (3 phase)
80A (3 phase)
63A (1 phase)
Read the Safety instructions regarding backfeed protection requirements.
Recommended cable minimum cross-sectional:
Model
6K(S) 1-1
10K(S) 1-1
10K(S) 3-1
Protective earthing conductor 10mm
2
10mm
2
10mm
2
Input L, N cable
6mm
2
10mm
2
10mm
2
Output L, N cable
6mm
2
10mm
2
10mm
2
Battery cable
6mm
2
10mm
2
10mm
2
The length of the output cable is recommended not to exceed 10 meters, otherwise, it may cause
radio interference. If a length of output cable over 10 meters requests, please contact distributors/
agents for details.
3.4.2 Wiring for AC Cable (AC source to UPS)
High leakage current:
Earth connection essential before connecting supply.
This type of connection must be carried out by qualified electrical person.
Before carrying out any connection, check that the upstream protection devices
(Normal AC source and Bypass AC source) are open "O" (Off).
Always connect the ground wire first.
1. Remove the cover of terminal block.
2. Connect the AC cable to terminal blocks:
•
Tower UPS
1-1 model: