16
Tower installing
UPS model
1. Rotate the LCD model to tower direction.
2. Set up the ‘
Tower foot
’, then take the unit into ‘
Tower foot
’.
EBM model
1. Set up the ‘Extension plate’ as below and install to ‘
Tower foot
’ from UPS.
2. Take the UPS& EBM into ‘Tower foot’ individually: Place EBM modular to UPS’s right
side and align with front-panel.