13
EBM model
EBM model
EBM installation steps are the same as UPS as above.
It is recommended to place EBM modular to UPS’s left side.
3.3.2 RT model:
1. RT models support 2 installation modes: Rack installation and Tower installation.
2. To keep good ventilation, please keep a free-space (500mm at least) for front / rear
panels of the module.
3. Do not carry the front/rear panel of the module during installing.
Rack installing
This procedure is suitable for 19 inch rack cabinet installation, it is recommended that
the depth of the cabinet be no less than 800mm.
UPS model
Identify the final position and keep ‘2U’ space for this installing.
1.
Install the rail kit (if configured). This rail kit is '2U & with screw holes (M5)', the
depth of the rail kit is: 415-763 mm.