12
RT model
1-1 model
3-1 model
RT EBM
RT UPS
6K/10K
RT UPS
6KS/10KS
RT UPS 10K RT UPS 10KS
Battery cable
O
O
√
EBM detection cable
√
Copper bus-bar
√
√
USB cable
√
√
√
√
RS232 cable
O
O
O
O
Parallel cable
O
O
O
O
Tower foot
√
√
√
√
Extension plate
of Tower foot
√
Rack ear
√
√
√
√
√
Rack rail kit
O
O
O
O
O
Quick start(EBM)
√
User manual(UPS)
√
√
√
√
Note
:
√
--- Standard configuration; O---Optional, default is Not configured;
3.3
Mechanical Install
3.3.1 Tower model
To keep air-flowing freely, it is recommended to keep a clearance with 500mm space
both for front and rear side.
UPS model
1.Place the unit on a flat, stable surface in its final location,
2.Install ‘tower foot’ (if configured): remove side’s screw from the unit, then install
‘tower foot’.
3.Install the unit to ground(optional): place 4pcs bolts (M8 is recommended) to the
final location previously, bolt’s position please refer to below, then fix the unit to the
bolts.