11.1 CT Testing (Customer Load)
Functionality:
Moves to next field
Moves to previous field
Enters drop down box and views test mode selections; checks/unchecks
check boxes
Moves cursor up and down for selecting a test mode in the drop down box
Views the database information for CT phase A (default)
Views the database information for CT phase B
Views the database information for CT phase C
Continues
Description:
This screen allows the user to perform a current transformer (CT) test using the customer’s load.
Checking the box “double wrap” is the only editable feature on this page.
The “Transformer Specs” for each individual phase are populated using the information from the
Site Editor. These fields cannot be edited in this screen, but must be edited in the Site Editor
screen.
Rev 1.5
86