10 Meter Testing
To perform a meter test without performing the full integrated site test(either because it has been
performed, or is not required to be performed), select the site you will be testing, then once the
menu changes to the one below, either press the number “3”, or highlight the number 3 and press
enter.
Functionality:
Moves cursor up and down to a menu selection
Accepts and enters menu selection
Rev 1.5
72