REV
. 012018
9
7 First time use
When the equipment is connected to the power supply, the
controller starts up and the display shows the manufacturer logo
and the loading beam. This takes about 20 seconds. (Fig. 1).
button switches the equipment off.
Next, the equipment asks you to select a language by pushing
the flag button (Fig. 2).
Date and time are set in the next phase (Fig. 3).
Select the date form EU/USA
Go up or increase the value
Select value to be changed or save the change
Go down or decrease the value
Exit – go back to the previous upper level
The box around the set value is the cursor.
When you have made the changes or you do not want to change
the values, press the Exit button in the right bottom corner and
move to the main menu
The controller automatically restarts in 60 seconds after changing
the time and date.
Fig. 1. Start-up window
Fig. 2. Selecting language
Fig. 3. Setting time and date
ENGLISH