
Automatic boiler for wood pellets
Instructions for installation and operation
49
TECHNICAL INFORMATION
NUMBER 001/2006
Technical change: BOILERS FAMILY KP xx HAVE BEEN EXPANDED WITH COMBUSTION PRODUCTS
THERMOMETER
Properties achieved:
Higher operating reliability has been achieved by installation of the combustion products thermometer. Burning of the
boiler gets under control by temperature evaluation of the combustion products. If the flame gets burnt out, the control
unit will evaluate this fact shortly and the boiler gets stopped. The combustion chamber and the burner thus do not get
filled with unburnt fuel.
Electric equipment of the boiler has been expanded with:
- Connector CANON 25 located on the subpanel on the rear side of the boiler - see the figure number Ti001/1.
- Interconnection of the boiler with the control unit - see the figure number Ti001/3.
- Thermometer probe with electronics.
Mechanical arrangement:
Figure number Ti001/1
Figure number Ti001/2
The end of the probe of the combustion products thermometer is distant approximately 20 mm from the opposite side of
the fume duct.
Summary of Contents for KP 10
Page 1: ......