Automatic boiler for wood pellets
Instructions for installation and operation
1 IMPORTANT NOTICES
This product may only be put into operation by an installation organization trained
by the manufacturer. This product may only be operated by adult persons, duly
acquainted with the way the product is controlled and duly acquainted also with these
Instructions. If you adhere to the below mentioned principles, the product will serve you
reliably to your full satisfaction.
1) It is prohibited to intervene in any way in the structure or electrical installation of products.
Having the equipment been disconnected from the electric network, the power supply cord has to
be plugged from the mains outlet!
2) It is prohibited to use inflammable liquids for ignition.
3) No inflammable materials may be stored on the boiler, neither may they be stored within the
distance of 1,500 mm from the boiler (except for operating stock in the metal bin).
4) In order to preserve long-term service life of the boiler body, it is not recommended to operate
the boiler frequently under the temperature of 60°C, if the boiler is not protected with a primary
circuit. The temperature of 60°C should be considered as the minimum temperature.
5) The check how the furnace is filled with fuel is only visual. Any verification with touch is
prohibited as it may result in injury.
6) If any work which generates inflammable vapours takes place in the boiler room (glueing the
floor, etc.), the boiler has to be out of operation and the fire has to be burnt out in the boiler.
7) The door of the boiler has always to be close shut. Should you perform any check, open the
door carefully to prevent from getting jeopardized by gathered products of combustion or to
prevent any sparks flying out from the boiler from being the cause of any accident. Open the
door slowly in order to get the combustion chamber aerated towards the chimney. This
procedure has to be adhered to when the ash is being removed from the ash pan's space.
8) Having the heating season been finished, clean the boiler thoroughly as per the chapter 7 -
Maintenance. Products of combustion stuck to the walls of the exchanger may act corrosively
for the whole period of time when the boiler will be out of operation. If the burner is not cleaned,
this may have effect on faulty combustion. We recommend to hire a specialized company to
perform this work.
9) If you work on or near to the mechanically movable parts (fuel feeder, etc.), ensure safe
disconnection of the equipment from electric voltage. There is a risk of injury.
10) You should always operate the boiler only under parameters and in harmony with
recommendations given in these Instructions for installation and operation.
If the boiler works in the AUTO mode and if there is a failure of current, the boiler will start
operation again with the electric firing programme (if this programme has been installed) after
the delivery of electric current is restored.
11) The manufacturer does not assume any liability for errors and subsequent damage caused by
unskilled operation of the equipment or by infringement of principles given in these Instructions
for installation and operation or by infringement of generally binding standards and regulations or
by using inadequate fuel.
12) If the boiler is moved or otherwise handled with, safety regulations which apply to handling with
heavy loads have to be adhered to.
13) It is prohibited to place heavy loads on jacketed boiler and to step on it. It is recommended to
remove the protective transport after all the building and installation work has been completely
finished.
4
Summary of Contents for KP 10
Page 1: ......