CICLI PINARELLO S.R.L. | Viale della Repubblica, 12 - 31020 Villorba (TV) - Italia
C.F. - R.I. - P.IVA IT 05994100963 | tel. +39 0422 42 08 77 | fax +39 0422 42 18 16 | www.pinarello.com
18
7.2
- Apply the heat-shrinking tubes to the four cables.
- Connect the four cables to the junction SM-JC41 and warm up the heat-shrinking tubes.
ATTENTION! max heating temperature 200°C, in order to not damage the electronic
cables.
- Place the junction SM-JC41 into the frame through the BB sleeve hole.
ATTENTION! no cables must remain in the BB sleeve.
Rear Derailleur installation:
- Insert the RD wire grommet into the drop out exit hole.
- Install the rear derailleur to the RD hanger. Tighten following OEM torque spec.
- Attach the 750mm wire EW-SD50 to the RD.
7
. ELECTRONIC GROUPSET (DI2) INSTALLATION AND CABLE ROUTING
GROMMET