CICLI PINARELLO S.R.L. | Viale della Repubblica, 12 - 31020 Villorba (TV) - Italia
C.F. - R.I. - P.IVA IT 05994100963 | tel. +39 0422 42 08 77 | fax +39 0422 42 18 16 | www.pinarello.com
33
10
. INTEGRATED HANDLEBAR (TALON ULTRA) ROUTING (MECHANICAL)
Route the FD and RD wires from the levers until the BB hole below the bottom bracket.
The wire will route automatically through the adjuster.
- Route the FD wire through the FD exit hole on the rear part of the seat tube, using
Teflon pipe.
- Route the RD wire through the right chainstay until the exit hole just above the dropout.
- Install the plastic BB guide and fix it with M4 screw. Tightening torque: 2 Nm.
- Connect FD wire to the FD following OEM instructions. Don’t forget to install the proper
grommet into the seat tube exit hole.
- Connect RD wire to the RD following OEM instructions. Don’t forget to install the
proper aluminum bushing and the Teflon pipe inside, into the right chainstay exit hole.
ATTENTION! The final tuning of the drivetrain (both FD and RD) will be done only at
final stage (see chapter “14. FINAL CHECKS”).
10.6
30