CICLI PINARELLO S.R.L. | Viale della Repubblica, 12 - 31020 Villorba (TV) - Italia
C.F. - R.I. - P.IVA IT 05994100963 | tel. +39 0422 42 08 77 | fax +39 0422 42 18 16 | www.pinarello.com
39
11
. BRAKE CABLE INSTALLATION (INTEGRATED HANDLEBAR)
RIM & MECHANICAL
Steps that must be followed before:
5. RIM BRAKE: INSTALLATION AND HOUSING ROUTING
8. MECHANICAL GROUPSET INSTALLATION
10. INTEGRATED HANDLEBAR (Talon ULTRA) ROUTING (Mechanical)
Follow steps 11.1.1, 11.1.2, 11.1.3, 11.1.4, 11.1.5 as before.
ATTENTION! In the stem exit hole on the right-hand side the FD housing must be in
front of the RB housing.
Follow steps 11.1.7, 11.1.8, 11.1.9, 11.1.10, 11.1.11 as before.
11.2
FD
FB
RD
RB
36
VIEW FROM BELOW!
11.2.1 The handlebar cable routing looks like this: