8
Installation
Figure 4 –
The UniFoiler System Components
The standard power cable lengths from the inverter to the sealing coil are ten feet on the hand
held coil system. The conveyor style system is supplied with standard ten-foot cables, which can
be removed from both the power supply and the coil. The connector (RECP. 1) located on the
rear of the power supply cabinet, is provided for attaching either the hand held or the conveyor
coil to the power supply. Note: The power supply is capable of sensing the type of coil attached
to the connector and will automatically update the mode of operation. Optional twenty-foot
cables for the conveyor coil are available upon request.
The power supply is air-cooled and contains a fan to circulate air inside the enclosure. A
minimum of twelve inches clearance should be provided on both sides of the enclosure to ensure
adequate air circulation.
The customer must supply the power supply with single phase input power. 120VAC and
240VAC models are both available from the factory, and a cable and plug are provided for ease
of connection to an appropriate outlet. Fusing and disconnecting means must be provided
according to applicable codes and practices. Full specifications are listed on page 29. Refer to
the connection diagram on page 32 for information about the power-input cable and connection
of the supply voltage.
Cables to the coil are to be routed to the coil support when applicable. The hand held coil is
provided with a cable fixed to the coil, and a connector on the end for attaching to the power
supply cabinet.
Summary of Contents for UniFoiler 3000
Page 10: ...4 Introduction This page left blank...
Page 19: ...Installation 13 This page left blank...
Page 24: ...18 Setup This page left blank...
Page 30: ...24 Operation This page left blank...
Page 36: ...30 Service Dimensions Figure 8 Coil Support Dimensions...
Page 37: ...Service 31 Figure 9 Enclosure Dimensions Figure 10 Internal Components...