Preventive Maintenance Tasks
Maintaining the Instrument
123
Preventive Maintenance Tasks
M3046A
Preventive maintenance for the Monitor comprises the following activities:
• Perform visual inspection (see“Inspecting the Instrument” on page 122)
• Replace the Backlight Tube Assembly (if required).
Replacing the Backlight Tube Assembly
The intensity of the fluorescent tube used for backlight illumination of the LCD Display
gradually decreases over time. As a result, periodic replacement is necessary.
Philips recommends replacement of the Backlight Tube Assembly after 3 years (20 000
hours) of continuous use or if there is noticeable decrease in the display illumination.
(Display illumination decreases by about half after 3 years of continuous use.) The procedure
for replacing the Backlight Tube Assembly is found in "Repairing the Instrument".
NOTE
After fitting new tubes, go to Service Mode and reset the Backlight-Tube counter to zero.
M3000A / M3001A
NBP Calibration and Performance tests
The preventative maintenance for the Non-invasive blood pressure measurement consists of
the following tests:
• Accuracy Test
• Leakage Test
• Linearity Test
• Valve Test
The tests are described in "Testing the Instrument", see also “NBP Accuracy, Leakage,
Linearity and Valve Test” on page 146.
Summary of Contents for M3000A
Page 2: ...Printed in Germany 03 05 Sixth Edition M3046 9300F Part Number M3046 9300F 4512 610 07711 S ...
Page 8: ...vi ...
Page 134: ...Answers to the Tutorial for Installing the Instrument 118 Installing the Instrument ...
Page 268: ...Monitor Parts 252 Replacement Parts Monitor Parts 5 4 3 7 2 1 6 ...