11
. COOLING SYSTEM
8
BR & M2 250 ENGINE
Connect the upper and lower hoses and secure
them with hose bands.
Connect the thermostatic switch wire and fan
motor wire couplers.
Connect the overflow tube and secure with the
tube clamp.
Fill the radiator with coolant. (
ð
3-9)
Connect the vent tube to the radiator filler.
After installation, check for coolant leaks.
.
Install the front upper cover.
Air Vent Tube
Radiator
Upper Hose
Overflow Tube
Lower Hose
Bolts
Thermostatic Switch Wire
Nuts
If you want to refill the coolant , the
following procedure must be checked.
1. Please make the radiator filler and the
air vent tube to be separated.
2. Then start the engine , filled in the coolant
till the coolant flowed out from the air
vent tube.
3. Put the air vent tube on.
*
Summary of Contents for Bug Rider BR-250
Page 1: ...BR 250 BR 250SS M2 250 SERVICE MANUAL Manufactured by PGO of Motive Power Industry Co Ltd...
Page 34: ...4 CYLINDER HEAD VALVES 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 46: ...5 CYLINDER PISTON 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 55: ...6 DRIVE AND DRIVEN PULLEYS KICK STARTER 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 71: ...7 FINAL REDUCTION 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 82: ...8 CARBURETOR BR M2 250 ENGINE...
Page 90: ...9 A C GENERATOR STARTER CLUTCH 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 97: ...10 CRANKCASE CRANKSHAFT 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 103: ...10 CRANKCASE CRANKSHAFT 7 BR M2 250 ENGINE Torque 7 8 11 8N m Cam Chain Tensioner Slipper Bolt...
Page 105: ...11 COOLING SYSTEM 1 BR M2 250 ENGINE SCHEMATIC DRAWING...