9
. A.C. GENERATOR/STARTER CLUTCH
5
BR & M2 250 ENGINE
INSTALLATION
Install the starter driven gear onto the crankshaft.
Install the starter idle gear and shaft.
FLYWHEEL INSTALLATION
Install the flywheel onto the crankshaft by aligning
the key on the crankshaft with the groove in the
flywheel.
Hold the flywheel with the flywheel holder and
tighten the flywheel nut.
Torque
: 34.3
∼
39.2N-m
STATOR INSTALLATION
Install the A.C. generator stator on the right
crankcase cover and secure it with the three bolts.
Install the pulser coil on the right crankcase cover
and secure it with the two screws.
Starter Idle Gear
Shaft
Groove
•
Before installation, check and make sure
that the inside of the flywheel is not
contaminated.
*
Starter Driven Gear
Flywheel
Key
Flywheel Holder
Summary of Contents for Bug Rider BR-250
Page 1: ...BR 250 BR 250SS M2 250 SERVICE MANUAL Manufactured by PGO of Motive Power Industry Co Ltd...
Page 34: ...4 CYLINDER HEAD VALVES 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 46: ...5 CYLINDER PISTON 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 55: ...6 DRIVE AND DRIVEN PULLEYS KICK STARTER 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 71: ...7 FINAL REDUCTION 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 82: ...8 CARBURETOR BR M2 250 ENGINE...
Page 90: ...9 A C GENERATOR STARTER CLUTCH 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 97: ...10 CRANKCASE CRANKSHAFT 1 BR M2 250 ENGINE SCHEMATIC DRAWING...
Page 103: ...10 CRANKCASE CRANKSHAFT 7 BR M2 250 ENGINE Torque 7 8 11 8N m Cam Chain Tensioner Slipper Bolt...
Page 105: ...11 COOLING SYSTEM 1 BR M2 250 ENGINE SCHEMATIC DRAWING...