CYLINDER HEAD/CYLINDER/PISTON
39
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
- Install the cylinder head.
- Fit the plate (4).
- Tighten the cylinder head securing 4 nuts
working diagonally in 2 or 3 steps (5).
Tightening torque: 20 Nm.
- Fit and tighten the 2 fixing bolts (6).
Tightening torque: 12 Nm.
Setting the timing
- Turn the magnetic wheel to line up the "T"
mark with the the crankcase boss (A).
- Fit the timing chain on the camshaft gear.
- Make sure the camshaft marks (B) are parallel
with the gasket seat surface (C).
- If necessary, dislodge the gear from the
camshaft without removing it and move the
chain around the gear on the required side.
- Fit the 2 screws.
Tightening torque: 12 Nm.
6
5
4
A
B
C
Summary of Contents for XS1P52QMI-4
Page 2: ......