SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A8 Cantilevers, Guardrails
Bracing on open building
edges to prevent tipping
Horizontal loads must be additional-
ly taken into consideration and
transferred, e.g. with bracing; see
Section A7.
Cantilevers with Panels SDP
Mount Tension Sleeve SAO (39) on
main beam. Distance to inner prop max.
50 cm. Brace using Anchor Chain (23),
Base Plate (24) and Anchor Bolt (24.1).
(Fig. A8.01)
Max. slab overhang: 37.5 cm.
Cantilevers with SKYDECK
Platforms SDB
(Fig. A8.02 + A8.03) See Cantilevers
with Panels SDP.
Corner table:
The Main Beams SLT “A + B” receive
2-fold horizontal load from the wind and
1-fold load from the stopend formwork
pressure. Additional bracing is required.
Fig. A8.03 shows only bracing from
Load Case Tilting.
Take into account Section A9
SKYDECK Platforms!
Fig. A8.03
Components
23
Anchor Chain (permissible ten-
sion force = 3 kN)
24
Base Plate RS
24.1
Anchor Bolt PERI 14/20 x 130
39
Tension Sleeve SAO
45
SKYDECK Platform SDK
Fig. A8.01
Fig. A8.02
SKYDEKC AuV_ex_791458.indb 42
13.12.16 16:56
Summary of Contents for SKYDECK
Page 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...