![Peri SKYDECK Instructions For Assembly And Use Download Page 21](http://html1.mh-extra.com/html/peri/skydeck/skydeck_instructions-for-assembly-and-use_1529937021.webp)
19
3
1
2
6
8
1,50 m
2,275 m
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A4 Shuttering
Transverse bay
1. Position prop with Prophead SSK (6).
Spacing 1.50 m.
2. Secure with tripod.
3. Position prop with Drophead SFK (1).
Spacing 2.275 m.
4. Insert Main Beam SLT 225 (2) into the
beam support of the Prophead and
Drophead. (Fig. A4.09)
5. Secure with tripod.
6. Insert panels (3). (Fig. A4.10)
J
J
The transverse bay is complete.
(Fig. A4.11)
Shuttering is carried out using a safe
mobile scaffold!
Working in a transverse direction is rec-
ommended.
Use tripods again in the next bay.
Components
1
Drophead SFK
2
Main Beam SLT
3
Panel SDP
6
Prophead SSK
8
Wall Holder SWH-2
Fig. A4.10
Fig. A4.11
Fig. A4.09
SKYDEKC AuV_ex_791458.indb 19
13.12.16 16:54
Summary of Contents for SKYDECK
Page 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...