![Peri SKYDECK Instructions For Assembly And Use Download Page 31](http://html1.mh-extra.com/html/peri/skydeck/skydeck_instructions-for-assembly-and-use_1529937031.webp)
29
0 – 6
0 – 6
7
6
7a
12
6
7
12
16
2.5
5,1 – 12,4
5,1 – 12,4
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A5 Compensations
Components
1
Drophead SFK
2.5
Main Beam SLT 150
3
Panel SDP
6
Prophead SSK
7
Combihead SCK
9
Edge Beam SRT-2 150
11
End Support SSL
12
Filler Timber SPH
13
Timber
14
Triangular Frame
15
Additional prop with crosshead and
formwork girder
16
21 mm formlining provided by the
contractor
Gap 5 – 12.5 cm
1. Place Main Beam SLT (2) on inset
prop with Combihead SCK (7) or
Prophead SSK (6).
2. Place additional props with trans-
versely positioned Combiheads SCK
(7a) in an offset arrangement.
3. Install Filler Timber SPH (12) or Edge
Beam SRT (9).
4. Position the formlining and secure
with nails. (Fig. A5.24 + A5.25)
Fig. A5.24
Fig. A5.25
Fig. A5.23
Fig. A5.22
Gap 0 – 6 cm
1. Place Combihead SCK (7) or Prop-
head SSK (6) in a recessed position
under the Main Beam SLT (2.5).
2. Nail Filler Timber SPH (12) or timber
up to max. 6 cm on the panel.
3. Install formlining (16) and secure with
nails. (Fig. A5.22 + A5.23)
Offset prop arrangement.
SKYDEKC AuV_ex_791458.indb 29
13.12.16 16:55
Summary of Contents for SKYDECK
Page 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...