![Peri SKYDECK Instructions For Assembly And Use Download Page 11](http://html1.mh-extra.com/html/peri/skydeck/skydeck_instructions-for-assembly-and-use_1529937011.webp)
9
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A1 Storage and transportation
Pallet: Handrail Unit SD 150
Pallet: Handrail Unit SD 75
Number of handrail units per pallet
Handrail Unit SD 150: 10 pieces
(Fig. A1.06)
Handrail Unit SD 75: 10 pieces
(Fig. A1.07)
Stacking:
2 loaded pallets, one on top of the other.
Loading sequence
1. Open locking mechanism on the pal-
let frame.
2. Slide in one handrail unit and close
locking mechanism.
3. Slide in additional handrail units.
Handrail units lock automatically
above the red bars.
4. Secure handrail units on the front side
against sliding out. Insert retaining bar
and lock in place.
Due to the powder coating, cleaning
requirements are kept to a minimum.
Panels and main beams are equipped
with self-draining edges. They prevent
the side areas from getting dirty and
make cleaning easier.
(Fig. A1.08)
Fig. A1.06
Fig. A1.07
Fig. A1.08
SKYDEKC AuV_ex_791458.indb 9
13.12.16 16:54
Summary of Contents for SKYDECK
Page 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...