![Peri SKYDECK Instructions For Assembly And Use Download Page 22](http://html1.mh-extra.com/html/peri/skydeck/skydeck_instructions-for-assembly-and-use_1529937022.webp)
20
α
3
8
8
8
8
2
α
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A4 Shuttering
Longitudinal bay
Based on the risk assessment, the
contractor must decide whether
forming takes place from above or
below!
1. Attach Main Beam SLT 225 (2) to the
Drophead.
2. Connect prop with Drophead in the
main beam. (Fig. A4.12)
3. Place prop in a vertical position.
(Fig. A4.12a)
4. Secure with tripod.
5. Proceed likewise with the second
main beam and prop.
6. Insert panels (3). (Fig. A4.13)
7. Remove tripod and use again in the
next bay.
J
J
The longitudinal bay is now com-
plete. (Fig. A4.14)
The Wall Holder SWH-2 (8) is mount-
ed in every second bay.
Risk of falling!
– When lingering on the slab form-
work, measures must be taken to
prevent falling, e.g. PPE.
– When shuttering from below, use
a safe and secure mobile scaffold;
install panels overhead.
If the SKYDECK Guardrail Holder is
used, this must be installed during set-
ting of the panels. For details, see Sec-
tion A8.
Components
2
Main Beam SLT
3
Panel SDP
4
Cover Strip SAL
5
Pallet SD
8
Wall Holder SWH-2
21
Panel Clip SPK
Fig. A4.14
During forming
from above, press
panel down with
the foot when in-
stalling.
Optimum angle for mounting the Main
Beam SLT up to
α
45°.
The main beam is correctly fitted only if
the corner of the recess hangs under
the prop without obstruction.
Fig. A4.12
Fig. A4.12a
Fig. A4.13
SKYDEKC AuV_ex_791458.indb 20
13.12.16 16:55
Summary of Contents for SKYDECK
Page 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Page 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...