52
64, 64.1
63
65
66
212
SW 36
332
18
8
Z
V
60
60.1
61
61.1
F2 Use as Horizontal Heavy-Duty Bracket
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
Single suspension with Wall
Scaffold Hinge SB
Brace Frame SB-A0, A, B
Working platform b ≤ 8.75 m.
Load combinations of the Wall Scaffold
Hinge: see PERI Design Information
Brace Frame SB
Required components per Brace
Frame:
60
Wall Scaffold Hinge SB
1x
61
Brace Frame Adapter SB-A0, A, B
1x
Anchor
Point
63
Climbing Cone-2 M36/DW 26
1x
64
Scaffold Mounting Ring M36
1x
64.1
Hex. Nut M36 x 130 10.9
1x
65
Tie Rod DW 26
1x
66
Threaded Anchor Plate DW 26
1x
Assembly
1. Pre-assemble Brace Frame and
remove front spindle, see B1.
2. Release both bolts (61.1) on the Brace
Frame Adapter (61), SW 36.
3. Push Brace Frame Adapter through
the holes of the Brace Frame.
4. Place Wall Scaffold Hinge SB (60) on
the Brace Frame, insert bolts through
the right and left holes as well as
through the holes of the Brace Frame
Adapter.
5. Firmly secure Wall Scaffold Hinge
with bolts on the Brace Frame.
(Fig. F2.01)
Erect working platform
– Erect working platform according to
the plan
– Brace the working platform with diag-
onals and secure open edges.
– Ensure stability.
Mount working platform
1. Lightly loosen the concreted Climbing
Cones-2 (63) and then re-tighten,
SW 55.
2. Screw in Scaffold Mounting Ring
M36 (64) with Hex. Bolts M36, SW
55 (64.1) into the Climbing Cones-2.
3. Remove bolts (60.1) from the Wall
Scaffold Hinges.
4. Attach working platform to the crane
(textile strap) and move.
5. Install working platform with the Wall
Scaffold Hinges in the Scaffold
Mounting Rings, and secure with
bolts. (Fig. F2.02 + F2.03)
Fig. F2.02
Fig. F2.01
Fig. F2.03
Have all Wall Scaffold Hinges been cor-
rectly mounted and secured?