B2 Connecting to the Systems
SB-A0, A, B, C
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
Assembly on RUNDFLEX
Max. concreting height h = 8.40 m.
Take into account the respective sys-
tem Instructions for Assembly and Use.
Required components per waler
section:
30
Waler Connector SB-A, B, C
1x
30.1
Wedge K
1x
– When planning, make sure that the
ends of the Brace Frames do not
touch (high elements, inner radius
min. 6.0 m)
– The elements are adjusted to suit the
radius.
Connecting with Waler Connector
SB-A, B, C
1. Place Brace Frame in position with
the crane.
2. Slide the required number of Waler
Connectors (30) onto the profile of
the Brace Frame - amount depends
on the length of the waler.
3. Adjust the formwork support (20.8) to
the required height (stop).
4. Lower the Brace frame, and push the
Waler Connector through the Distri-
bution Waler (39).
The bottom Distribution Waler lies
against the formwork support.
5. Fix Waler Connectors with Wedge K
(30.1) starting from the bottom.
(Fig. B2.02 - B2.02b)
6. For further work steps, see Section
B2 VARIO GT 24 from Point 6.
Assembly on vertically-positioned
elements
VARIO GT 24 and RUNDFLEX
1. Erect, move and align the formwork
unit and temporarily secure with
push-pull props.
2. Lift the Brace Frame with the crane
behind the steel walers/Distribution
Walers. (Fig. B2.03a)
3. Slide Waler Connectors (30) onto the
profiles of the Brace Frames, insert
into the steel waler/Distribution Waler,
and secure with Wedge K (30.1).
(Fig. B2.02a + B2.03b)
The steel waler/Distribution Waler lies
against the formwork support (20.8).
(Fig.
B2.02b)
4. For further work steps, see Section
B2 VARIO GT 24 from Point 6.
Fig. B2.02
Fig. B2.02a
Fig. B2.02b
Example:
VARIO, lifting the Brace Frame
Example:
RUNDFLEX mounted
Fig. B2.03a
Fig. B2.03b