E3 Dismantling
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
Dismantling the Brace Frame
Begin with SB-C
1. Release the connecting bolts (20.5)
between the Brace Frames and re-at-
tach in the top Brace Frame.
2. Safely store the Spindles TR (20.6 +
20.7).
3. Stack Brace Frames of the same size
and secure with steel strapping, see
A1.
(Fig.
E3.04)
SB-A0, A, B, C
– Always attach transportable units
to the Brace Frame when trans-
porting.
– Always use the available
load-bearing points as well as tex-
tile straps!
– Take into account the permissible
load-bearing capacities!
– Before setting down each time, al-
ways check the mountings/wedg-
es. If necessary, secure wedges
with cotter pins or screws!
Dismantling
Girder and panel formwork
1. Position unit on timbers. (Fig. E3.01)
2. Dismantle working platform and
access means.
3. Remove bracing.
4. Release and remove connections to
the system (30, 31, 32 and 33).
5. Release Brace Frames one after the
other from the formwork and lay
down using the crane.
6. Remove connections (30, 31, 32 and
33) to the formwork unit and Brace
Frame.
(Fig. E3.02 + E3.03)
Fig. E3.01
Fig. E3.02
Fig. E3.03
Fig. E3.04