10
ENGLISH
In some cases, the pump and the pumping medium may be hot
and could cause burns.
For installations in areas subject to explosion hazards, special
regulations apply!
APPLICATION
compli sewage lifting stations are LGA certified and are suit
-
able for lifting sewage from toilets and urinals, and domestic
wastewater containing the usual impurities.
The tanks can withstand submersion to a depth of not more
than 2 m of water and a submersion period of up to 7 days.
The control unit cannot withstand submersion, but is splash-
proof in accordance with IP 44.
If installed in compliance with the regulations and used prop-
erly, then this control unit meets the protective requirements
of the EMC Directive 2014/30/EU and is suitable for domestic
use and connection to a power supply from the grid. When
connected to an industrial mains within an industrial operation
with power supply provided by a company-own high-voltage
transformer, insufficient immunity to interference has to be
expected.
When using the pumps, the relevant national laws, regulations
and stipulations must be adhered to, for example:
•
Sewage lifting stations for building and ground drainage sys-
tems (e.g. EN 12050 and EN 12056 in Europe)
•
Installation of low voltage systems (e.g. VDE 0100 in Ger-
many)
•
Safety and working materials (e.g., BetrSichV and BGR 500
in Germany)
•
Safety in wastewater systems (e.g., GUV-V C5, GUV-R 104
and GUV-R 126 in Germany)
•
Electrical systems and operating resources (e.g., GUV-V A3
in Germany)
•
Explosion protection EN 60079-0, EN 60079-1, EN 60079-14,
EN 60079-17 and EN 1127-1
Supply package
•
One or two tanks with a DN 150 inlet clamping flange
•
Two submersible drainage pumps
•
Duckfoot bend for the pumps
•
Flexible connector(s) with clamps for the DN 70 vent pipe
•
Flexible connectors with clamps for the duckfoot bend
•
Flexible connector with clamps for the pressure pipe
•
Fastening materials for tank and duckfoot bend
•
Control unit
Operating mode:
Intermittent operation S3; see
“Technical data”
INSTALLATION
The pump must be installed so that it is buoyancy-proof and
free-standing. At least 60 cm free working space must be pro-
vided around and above the parts that require access for op-
eration or maintenance.
Ventilation: The vent pipe must be vented above roof level.
Inlet: A wastewater stop valve must be fitted in the tank inlet.
In order to continue using the pump in the event of a fault or
maintenance work, a maintenance valve must be fitted be
-
tween each pump and the tank.
Pressure pipe: A further wastewater sluice valve must be in-
stalled behind the EN-certified swing-type check valve in the
pressure pipe. The pressure pipe must be laid in a loop above
the local backup level.
A pump sump must be provided to facilitate the disposal of wa-
ter from the pump installation area.
compli 1500 and compli 2500 sewage lifting stations are
supplied as assembly groups and are assembled on site by a
plumbing company.
NOTICE!
All screws and bolts that are used for fixing individual
components to the tank should be tightened with a torque of
no more than 6 Nm.
Summary of Contents for COMPLI 15100/2 B5
Page 2: ...2 ...
Page 43: ...43 compli 1500 ...
Page 44: ...44 compli 2500 ...
Page 45: ...45 ...
Page 46: ...46 ...
Page 50: ...50 BS 1016 PD BS 1620 PD ...
Page 51: ...51 BS 1016 PD BS 1620 PD ...
Page 52: ...52 Main switch BS 2532 PD ...
Page 53: ...53 pot free contact optional YE YE GN YE GN GN RD RD BS 2532 PD ...