PV700a / PV1000a pellet burners
p
25/ 59
DK9401B1 www.pelltech.eu
2.5 Pellet storage
Pellets must be stored in a dry and ventilated room that is separated from the boiler room. A tailor made
storage (silo) is recommended. All safety regulation must be taken into consideration according to the
local laws. It is recommended to wear a respirator when handling pellets. Refilling must be carried out
before the storage runs empty.
2.6 Electrical connections
Following connections must be done by the electrical installer:
1-phase supply and boiler’s thermostat to socket X11 . See Figure 27.
3-phase supply to socket X12
External auger to socket X14
Names and marking of sockets is described on Table 4.
Figure 27 Connection of socket X11
>60cm
>65
o
max45
o
20cm
Figure 26 External auger installation