Introduction
37
SmartNode 4900 User Manual
4 • Getting started with the SmartNode 4900 Series
Introduction
This chapter leads you through the basic steps to set up a new SmartNode and to download a configuration.
Setting up a new SmartNode consists of the following main steps:
Note
If you have not already installed the SmartNode, refer to chapter 3,
“Hardware installation”
on page 24.
1. Configuring the desired IP address
(see
figure 14
). Refer to section
“2. Connecting the SmartNode to
the network”
on page 41 for details.
Figure 14. Connecting the SmartNode to your laptop PC
2. Connecting the SmartNode to the network
(see
figure 15
). Refer to section
“1. Configure IP address”
on
page 38 for details).
Figure 15. Connecting the SmartNode to the network
100-240V
(50-60 Hz)
1 AMP
UNIT EQUIPPED WITH DUAL SUPPLIES
DISCONNECT BOTH SUPPLIES
BEFORE
SERVICING
UNIT EQUIPPED WITH DUAL SUPPLIES
DISCONNECT BOTH SUPPLIES
BEFORE SERVICING
100-240V
(50-60 Hz)
1 AMP
ETH 0/0
NIC ADDRESS
00:A0:BA:00:04:10
Console
Telco Ports
50
1
Reset
Expansion
ETH 0/1
Status
Activity
Console port
Laptop PC
Model 16F-561
adapter and cable
100-240V
(50-60 Hz)
1 AMP
UNIT EQUIPPED WITH DUAL SUPPLIES
DISCONNECT BOTH SUPPLIES
BEFORE SERVICING
UNIT EQUIPPED WITH DUAL SUPPLIES
DISCONNECT BOTH SUPPLIES
BEFORE SERVICING
100-240V
(50-60 Hz)
1 AMP
ETH 0/0
NIC ADDRESS
00:A0:BA:00:04:10
Console
Telco Ports
50
1
Reset
Expansion
ETH 0/1
Status
Activity
LAN (ETH 0/1)
Network
interface
PC or workstation
or Telnet
LAN
Internet or
WAN (optional)
WAN
(ETH 0/0)
Summary of Contents for SmartNode 4900
Page 46: ...46 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 47 ...
Page 68: ...68 Appendix D Factory Configuration Chapter contents Introduction 68 ...
Page 73: ...73 Appendix F Installation checklist Chapter contents Introduction 73 ...
Page 75: ...75 Appendix G Accessories Chapter contents Introduction 75 ...