11
Stainless Steel Air Motors
P1V-S
Service interval
The first service is due after approximately 500 hours of operation.
After the first service, the service interval is determined by the degree
of vane wear*. The table below shows new dimensions and the
minimum dimensions of worn vanes.
Continuous lubrication-free operation of motors equipped with
hard vanes (option C)
Duty cycle :
Continuous
Filtration 40 µm :
750 hours of operation*
Filtration 5 µm :
1000 hours of operation*
CE marking
The air motors are supplied as “Components for installation” – the
installer is responsible for ensuring that the motors are installed safely
in the overall system. Parker Pneumatic guarantees that its products
are safe, and as a supplier of pneumatic equipment we ensure that
the equipment is designed and manufactured in accordance with the
applicable EU directive.
Most of our products are classed as components as defined by
various directives, and although we guarantee that the components
satisfy the fundamental safety requirements of the directives to the
extent that they are our responsibility, they do not usually carry the CE
mark. Nevertheless, most P1V-S motors carry the CE mark because
they are ATEX certified (for use in explosive atmospheres).
The following are the currently applicable directives:
• Machinery Directive(essential health and safety requirements
relating to the design and structure of machines and safety
components)
• EMC Directive
• Simple Pressure Vessels Directive
• Low Voltage Directive
• ATEX Directive (ATEX = ATmosphere EXplosive)
X
* The specified hours of operation apply
when the motor is running at the speed
corresponding to maximum power (load
speed). This is approximately half free speed.
If the motor operates at higher speeds, the
service interval is shorter.
If the motor operates at lower speeds, the
service interval is longer.
Air motor
Dimensions on new vanes X(mm), type of vanes
Standard
Z
C
M
P1V-S002
3,3
–
–
–
P1V-S008
4,3
–
–
–
P1V-S012
4,
4,
4,
4,
P1V-S020
6,5
6,0
6,0
6,0
P1V-S030
6,8
6,
6,8
6,
P1V-S060
9,0
9,0
9,0
9,0
P1V-S120
14,7
14,0
14,0
14,0
Air motor
Minimum dimensions on vane X (mm), type of vanes
Standard
Z
C
M
P1V-S002
3,0
–
–
–
P1V-S008
4,0
–
–
–
P1V-S012
3,3
3,3
3,3
3,3
P1V-S020
5,8
5,3
5,3
5,3
P1V-S030
6,0
5,
6,0
5,
P1V-S060
6,0
6,0
6,0
6,0
P1V-S120
14,
13,5
13,5
13,5
Drilling, milling
and
grinding
motor
New dimensions
X(mm)
Minimum dimensions
X (mm)
P1V-S008
4,3
4,0
P1V-S017
4,
3,3
P1V-S025
6,5
5,8
P1V-S040
6,8
6,0
The following normal service intervals should be applied to in order to
guarantee problem-free operation in air motors working continuously at
load speeds*.
Intermittent lubrication-free operation of motors with standard
vanes
Duty cycle :
70%
Max. duration of intermittent use :
15 minutes
Filtration 40 µm :
750 hours of operation*
Filtration 5 µm :
1 000 hours of operation*
Continuous operation of motors with standard vanes, with lubri-
cation
Duty cycle :
Continuous
Quantity of oil :
1 drop per m³ of air
Filtration 40 µm :
1 000 hours of operation*
Filtration 5 µm :
000 hours of operation*
NOTE! After 1000 hours of operation, the grease in the planetary
gearbox must be changed
Summary of Contents for 1P1V-S020A00005
Page 66: ...66 Stainless Steel Air Motors P1V S...
Page 67: ......