Operation
3-47
3160-A2-GB21-80
March 1999
Configuring for Network Timing
Procedure
To configure for network timing:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Gen selection appears on
the screen.
5. Select Gen.
F1
Edit:
NET
Chan
Gen
F2
F3
6. Press F1 (Next) to display the next configuration option (Clock Src).
7. Select the master clock source. For network, press F2 (note that network is
also the default).
F1
Clock Src:NET
Next
NET
DTE
F2
F3
Configuring for External Timing
Procedure
To configure 2-port and 4-port DSU/CSUs for external timing:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Gen selection appears on
the screen.
Summary of Contents for ACCULINK 3160
Page 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Page 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Page 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Page 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Page 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Page 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...