
8. Testing
3150-A2-GB24-10
March 2001
8-7
Line Loopback (LLB)
The Line Loopback command (LLB) loops the received signal on the network
interface (NI) back to the network without change.
Procedure
To perform a Line loopback:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Lpbk.
3. From the Loopback screen, select LLB.
Test Started
appears on Line 2. If a line loopback is already in progress,
the
Already Active
message appears. If an invalid combination of
loopbacks is in progress, the error message
Invld Test Combo
appears
(see
Table 8-2, Valid Loopback Combinations
, for valid loopback test
combinations).
F1
F2
F3
Test:
Rlpbk Lpbk Ptrns
F1
F2
F3
Loopback:
Abort LLB PLB
Summary of Contents for ACCULINK 3150
Page 1: ...ACCULINK CSU Models 3150 A4 and 3151 Operator s Guide Document No 3150 A2 GB24 10 March 2001...
Page 16: ...About This Guide x March 2001 3150 A2 GB24 10...
Page 28: ...2 Installation 2 8 March 2001 3150 A2 GB24 10...
Page 40: ...3 Using the Front Panel 3 12 March 2001 3150 A2 GB24 10...
Page 66: ...4 Configuration 4 26 March 2001 3150 A2 GB24 10...
Page 74: ...5 Security 5 8 March 2001 3150 A2 GB24 10...
Page 118: ...8 Testing 8 18 March 2001 3150 A2 GB24 10...
Page 120: ...A Front Panel Menu A 2 March 2001 3150 A2 GB24 10...
Page 152: ...C Configuration Options C 30 March 2001 3150 A2 GB24 10...
Page 168: ...E Pin Assignments E 10 March 2001 3150 A2 GB24 10...
Page 192: ...F SNMP MIB Objects F 24 March 2001 3150 A2 GB24 10...
Page 218: ...J Equipment List J 2 March 2001 3150 A2 GB24 10...