BA_PH_BSB-400-900_EN_44-21.docx
27
8
Commissioning
Read the operating manual and the chapter
“Safety”
carefully before commissioning and observe them.
Before switching on, check that
•
the floor around the machine is clean and free of interfering parts and workpieces,
•
there are no loose parts on the machine table and all tools have been removed,
•
the bandsaw blade is well ground and correctly positioned on the guide rollers,
•
there are no objects in the bandsaw wheels,
•
the safety guards are fitted according to regulations,
•
the extraction system is connected and in good working order,
•
the saw blade tension is correctly adjusted,
•
the V-belts are tensioned
•
and no persons are in a danger zone of the machine.
8.1
Switching ON and OFF
8.1.1
Switch on 2.2 kW Models
Figure 16: Machine switch (2.2 KW)
•
Check saw blade tension (tighten if necessary).
•
Make sure that there are no objects on the machine,
the doors are closed and the safety switches (refer to
section
9.2) are locked.
Switching ON:
•
Turn main switch (
1
) to position
“
I
”
.
Switching OFF:
•
Turn main switch (
1
)
to position “
”
→
Machine is braked.
Release the brake:
•
Turn main switch (
1
)
to position “
”.
•
Turn the locking latch (
B
) to the left
(see red marked position in
•
Turn the main switch (
1
) all the way to the left
→
Brake is released (dwell time = 10 s).
8.1.2
Switch on 3.0 - 7.5 kW Models
Figure 17: Machine switch (3.0 - 7.5 kW)
•
Check saw blade tension (tighten if necessary).
•
Make sure that there are no objects on the machine,
the doors are closed and the safety switches (refer to
section
9.2) are locked.
Switching ON:
•
Turn the main switch (
1
) to the
“
START
”
position and
hold it there until full speed is reached.
•
Release the switch (jumps back to position
”
I
”
).
Switching OFF:
•
Turn main switch (
1
) to position “
”.
→
Machine is braked.
Release the brake:
•
Turn main switch (
1
) to position
“
I
”
→
Brake is released (dwell time = 10 s).
1
B
F
1
F