is in the upward position as shown.
Fig. J3-2
2. Confirmation/Alignment of Intermediate Gear B, Main Cam Gear, and
Intermediate Gear A
A. Confirm that the Hole A on Lift Gear is a Through Hole with a hole
on chassis.
B. Confirm that the hole on Intermediate Gear A is aligned with the
hole on Lift Gear.
Fig. J3-3
C. Install the Intermediate Gear B so that the hole on the Intermediate
Gear B is aligned with the hole on the Main Cam Gear.
Fig. J3-4
31
Summary of Contents for PV-D4733S-K
Page 15: ...R1522 ERJ6GEYJ103V MGF CHIP 1 10W 10K 15 ...
Page 45: ...Fig 16 1 Fig 16 2 6 1 4 2 REMOVAL OF CSP IC Fig 16 3 45 ...
Page 46: ...6 1 4 3 INSTALLATION OF CSP IC Fig 16 4 46 ...
Page 47: ...Fig 16 5 47 ...
Page 48: ...6 1 4 4 CSP IC LOCATION Fig 16 6 48 ...
Page 134: ...Fig D2 22 ...
Page 139: ...5 2 2 Inner Parts Location Fig J1 1 27 ...
Page 140: ...5 2 3 EJECT Position Confirmation Fig J1 2 28 ...
Page 147: ...5 2 8 Capstan Motor Unit Fig J6 5 2 9 T Loading Arm Unit and S Loading Arm Unit Fig J7 1 35 ...
Page 152: ...5 3 CASSETTE UP ASSEMBLY SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 40 ...
Page 168: ...10 2 MECHANISM BOTTOM SECTION 56 ...
Page 169: ...10 3 CASSETTE UP COMPARTMENT SECTION 57 ...
Page 170: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 58 ...
Page 171: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 59 ...
Page 187: ...75 ...
Page 192: ...80 ...
Page 194: ...82 ...
Page 202: ...90 ...