2. Insert a Tension Meter into tape path and measure the back tension.
Fig. M2-1
3. If the reading is out of specification, make sure that there is no dust or
foreign material between the Brake Pad of Tension Control Arm Unit
and the S Reel Table.
After cleaning, the reading of tension measurement is still out of
specification, replace the Tension Arm Unit and the Tension Control
Arm Unit.
Fig. M2-2
Note:
1. Be sure that the three probes of the meter are all in solid contact with
the tape, but not touching any other parts of the mechanism.
2. It is recommended that measurements should be repeated at least
three (3) times because the tension meter is very sensitive to external
vibrations.
6.2.2.2. TAPE INTERCHANGEABILITY ADJUSTMENT
Note:
To perform these adjustment/confirmation procedures, enter the
Tracking center mode.
45
Summary of Contents for PV-D4733S-K
Page 15: ...R1522 ERJ6GEYJ103V MGF CHIP 1 10W 10K 15 ...
Page 45: ...Fig 16 1 Fig 16 2 6 1 4 2 REMOVAL OF CSP IC Fig 16 3 45 ...
Page 46: ...6 1 4 3 INSTALLATION OF CSP IC Fig 16 4 46 ...
Page 47: ...Fig 16 5 47 ...
Page 48: ...6 1 4 4 CSP IC LOCATION Fig 16 6 48 ...
Page 134: ...Fig D2 22 ...
Page 139: ...5 2 2 Inner Parts Location Fig J1 1 27 ...
Page 140: ...5 2 3 EJECT Position Confirmation Fig J1 2 28 ...
Page 147: ...5 2 8 Capstan Motor Unit Fig J6 5 2 9 T Loading Arm Unit and S Loading Arm Unit Fig J7 1 35 ...
Page 152: ...5 3 CASSETTE UP ASSEMBLY SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 40 ...
Page 168: ...10 2 MECHANISM BOTTOM SECTION 56 ...
Page 169: ...10 3 CASSETTE UP COMPARTMENT SECTION 57 ...
Page 170: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 58 ...
Page 171: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 59 ...
Page 187: ...75 ...
Page 192: ...80 ...
Page 194: ...82 ...
Page 202: ...90 ...