Page 1-57
REGULAR
MAINTENANCE
1
Check Every 560 Hours (Every Month)
1-5-3
Checking the Board Transfer Belts and Rollers
Check the board transfer belt and roller of the left and right board conveyors and board holder.
Checking procedures
1.
Press
UNLOCK
and .
• The board holder moves up to the mainte-
nance position.
2.
Turn off the servo switch.
1.
Checking the damage of belt and roller
1.
Check them at the edge of each con-
veyor (holder), rotating the belt by
hand (visually).
Changing belts by check
“1-7-1 Changing the Board Transfer Belts
PCB stage
rise
1. Checking the damage of belt and the eccentric of roller
Changing the belts and rollers
2. Checking the tension of belt
Adjusting the tension
OFF ( ) ON ( )
SERVO
493C-E-MMA01-A07-01
433C-082P
433C-083P
Summary of Contents for KXF-493C
Page 2: ......