
1-10-8
1
1
■
Wiring procedure
Follow the wiring procedure below for terminal connection.
(1) Set the wiring and cables for the power and signal lines to the outdoor unit together, and secure each wire and cable with the tie.
(2) Set up the wiring and cable for the outdoor unit piping and secure with a tie.
1
Secure and clamp the wiring and cable together with power and signal lines using the tie.
2
Secure and clamp all wiring and cable together with the indoor/outdoor piping using the tie
(field supply).
01_301769_2WAY_eng.indb 23
2018/3/20 9:15:03
SM830266-00_大洋州向けR32シングルTD&SM.indb 8
18/03/29 10:19:56
Summary of Contents for Inverter R32 Series
Page 93: ...1 10 10 1 SM830266 00_ R32 TD SM indb 10 18 03 29 10 19 58...
Page 94: ...1 10 11 1 SM830266 00_ R32 TD SM indb 11 18 03 29 10 19 58...
Page 95: ...1 10 12 1 SM830266 00_ R32 TD SM indb 12 18 03 29 10 19 59...
Page 96: ...1 10 13 1 SM830266 00_ R32 TD SM indb 13 18 03 29 10 20 00...
Page 241: ...MEMO 1 13 11 SM830266 00_ R32 TD SM indb 11 18 03 29 10 21 37...