DA-PU100 Series Administrator's Manual
6
1.3
Available tools
The following three tools are available to support efficient work during new installation, maintenance,
and operation monitoring of the PLC adaptor.
No.
Tool
When
Abstract
1
Setting Tool
New installation
Performs parameter settings of multiple PLC adaptors
in batch during initial installation.
2
Maintenance Tool
Maintenance
Confirms communication status during installation and
operation.
Changing parameter settings and firmware updating is
also possible.
3
Monitoring Tool
Operation
monitoring
Notifies when an error occurs in the PLC adaptor.
It is possible to output the status of the PLC adaptor
as a log.
Setting Tool
Maintenance Tool
Monitoring Tool
・
A maximum of 1,024 units can be
collectively set with a csv file(shared
key, IP address etc.)
・
Sequential setting by a csv file.
・
Confirms connection status
・
Analysis during comm. failure
・
Detects lost unit reliably by
comparison with initial settings
・
Notifies by e-mail or alert when
disconnected or speed reduced
・
Automatic recording of abnormal
situations
Summary of Contents for HD-PLC DA-PU100
Page 1: ...Administrator s Manual PLC Adaptor Model No DA PU100 ...
Page 4: ...DA PU100 Series Administrator s Manual 4 Chapter 1 Introduction ...
Page 9: ...DA PU100 Series Administrator s Manual 9 Chapter 2 Installation and Operation ...
Page 25: ...DA PU100 Series Administrator s Manual 25 Chapter 3 PC Tools ...
Page 32: ...DA PU100 Series Administrator s Manual 32 Chapter 4 Preparation for Operation ...
Page 58: ...DA PU100 Series Administrator s Manual 58 Chapter 5 Troubleshooting ...
Page 62: ...DA PU100 Series Administrator s Manual 62 Chapter 6 Specifications ...
Page 65: ...DA PU100 Series Administrator s Manual 65 7 Dimensions With the fixing brackets attached ...