DA-PU100 Series Administrator's Manual
41
(2)
When there is another distribution board between PLCs
These are examples using Japanese power line and distribution board.
If another distribution board (distribution board B) exists on the path between PLCs, if PLC 1 and
PLC 2 cannot communicate (PLC link is not made), install PLC 3 on distribution board B.
You can communica
te by hopping with PLC 1 → PLC 3 → PLC 2.
Place the PLC 3 in the 200 V phase on the secondary side of the main breaker. If the location is
difficult to install, install the PLC 3 on the secondary side of the sub breaker connected to the outlet
to install the PLC 2.
Add PLC3
Distribution board A
Distribution board B
Summary of Contents for HD-PLC DA-PU100
Page 1: ...Administrator s Manual PLC Adaptor Model No DA PU100 ...
Page 4: ...DA PU100 Series Administrator s Manual 4 Chapter 1 Introduction ...
Page 9: ...DA PU100 Series Administrator s Manual 9 Chapter 2 Installation and Operation ...
Page 25: ...DA PU100 Series Administrator s Manual 25 Chapter 3 PC Tools ...
Page 32: ...DA PU100 Series Administrator s Manual 32 Chapter 4 Preparation for Operation ...
Page 58: ...DA PU100 Series Administrator s Manual 58 Chapter 5 Troubleshooting ...
Page 62: ...DA PU100 Series Administrator s Manual 62 Chapter 6 Specifications ...
Page 65: ...DA PU100 Series Administrator s Manual 65 7 Dimensions With the fixing brackets attached ...